Industries

Metals and construction materials

Dense cargo fills a trailer's weight limit long before it fills the deck. Getting metals moved economically is a question of load planning and securing, and both are decided before the truck is loaded.

01Cargo

What we move

  • Output of metallurgical plants
  • Tubes, fittings and metal sheet
  • Cable drums and reels
  • Construction materials
  • Production lines for construction materials

02Our approach

How we move it

  1. 01

    Coil trailers and flatbeds

    Purpose-built equipment for steel coil and long products, rather than forcing dense cargo into a standard curtainsider.

  2. 02

    Load planning by axle

    Weight distribution planned to the axle limits of every country on the route, so the load is not stopped at a weighbridge halfway.

  3. 03

    Securing to standard

    Cargo secured to EN 12195 and the IMO/UNECE CTU code, photographed at loading.

03Paperwork

Documents and compliance

  • EX-1 export declarations
  • T1 transit documents
  • Weight and dimension certificates
  • Loading photographs issued with the CMR

Moving this kind of cargo?

Send us the commodity, the route and the dimensions. We will come back with a routing and a price.

New enquiry