Industries
Metals and construction materials
Dense cargo fills a trailer's weight limit long before it fills the deck. Getting metals moved economically is a question of load planning and securing, and both are decided before the truck is loaded.

01Cargo
What we move
- Output of metallurgical plants
- Tubes, fittings and metal sheet
- Cable drums and reels
- Construction materials
- Production lines for construction materials
02Our approach
How we move it
- 01
Coil trailers and flatbeds
Purpose-built equipment for steel coil and long products, rather than forcing dense cargo into a standard curtainsider.
- 02
Load planning by axle
Weight distribution planned to the axle limits of every country on the route, so the load is not stopped at a weighbridge halfway.
- 03
Securing to standard
Cargo secured to EN 12195 and the IMO/UNECE CTU code, photographed at loading.
03Paperwork
Documents and compliance
- EX-1 export declarations
- T1 transit documents
- Weight and dimension certificates
- Loading photographs issued with the CMR
Moving this kind of cargo?
Send us the commodity, the route and the dimensions. We will come back with a routing and a price.



